A1 Newton on the Moor in-situ recycling & graphene trial project

Get in touch

Image
Construction Recycling / Surfacing & Cold Milling

  • ClientStabilised Pavements Ltd / National Highways

  • Value£2,200,000

  • DurationOctober 2021

The use of new materials, innovative recycling processes and ‘state of the art’ equipment significantly shortened the project schedule, reduced road user disruption and lowered the carbon footprint of the project.

The project scope

This resurfacing project was a demonstration trial in the use of ‘in situ’ recycled of road material with the additional introduction of graphene to strengthen and prolong the working life of the road surface. We worked in collaboration with Stabilised Pavements Ltd to remove, recycle and re-lay the existing road surface using new ‘in-situ’ Cement Bound Granular Material (CBGM) recycling technology and equipment without the material leaving the site. DSD Construction were responsible for the planing out and reinstallation of the road surface material in close collaboration with Stabilised Pavements Ltd which required close collaboration and coordination of plant and personnel with a continual production line of over 100 metres of plant and equipment.

To lay the recycled material, we deployed our new Volvo tracked paving machine which allowed us to lay the full depth of surfacing material directly onto the sub surface in one pass to a tolerance of +- 6mm. This removed the requirement to lay a binder course, significantly reducing cost and schedule and reducing the carbon footprint of the project. Additionally, the Volvo paving machine uses new compaction technology to compact the asphalt as it is laid, achieving 70% of its final compaction value – reducing the amount of subsequent rolling required. To reduce the amount of rolling further, we employed a Pneumatic Tyre Roller which uses a kneading action to efficiently compact the asphalt in fewer passes.

The trial also involved the use of raw graphene mixed with the CBGM over 30 metres of the road resurfacing to form a new stronger recycled road surface. After several months of lab-based development at the Graphene Engineering Innovation Centre (GEIC) at The University of Manchester, this project was used to test in-situ recycling of road surface with added graphene as a ‘world’s first’ trial in collaboration with Pavement Testing Services (PTS).

Key quantities:

  • Recycled material: 36,000 m²
  • Per day productivity: 2,000 t

Challenges & successes

This was a trial in the use of new materials (CBGM and graphene) using new equipment. To ensure the trial was successful at site, we carried out a series of practice operations at our Carlisle HQ prior to the project.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services