A594 Maryport to Dovenby resurfacing, Cumbria

Get in touch

Image
Surfacing & Cold Milling

  • ClientConnect Roads, Balfour Beatty

  • Value£548,000

  • DurationJuly 2020 - August 2020

Our work was carefully planned to minimise the construction schedule and maintain access to residents and businesses.

The project scope

Road closure and resurfacing of the main A594 trunk road between Maryport and Dovenby. This required traffic management to ensure continual access to local residents in Dovenby, Dearham and surrounding villages plus access to the headquarters of M-Sport – a local employer of 300 people requiring continual access for deliveries and exports. The scope of work included:

  • Traffic management
  • Surveys and setting out
  • Cold milling
  • Kerbing
  • Realignment of ironwork
  • Highway surfacing
  • Footway reconstruction
  • Top soiling and seeding
  • Public liaison

Key quantities:

  • Cold milling: 15,000 m²
  • Kerbing: 1,066 m
  • Items of ironwork replaced: 55

Challenges & successes

The A594 is a main route connecting the towns of Maryport and Cockermouth and is a key commuter and school transport route. The project was scheduled for daytime working only due to noise restrictions. To ensure the project was completed and the road reopened as quickly as possible, we increased production output by assigning additional plant and labour to shorten the schedule.

To ensure access was maintained to the M-Sport Headquarters, we planned our work in two phases – Phase 1 was resurfaced from the M-Sport access junction towards Cockermouth and Phase 2 was resurfaced from the M-Sport junction towards Maryport – maintaining an access route at all times.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.