A595 Duddon Bridge to Muncaster resurfacing

Get in touch

Image
Surfacing & Cold Milling

  • ClientCumberland Council

  • Value£620,000

  • DurationJanuary 2022

The resurfacing of the main arterial road through West Cumbria was successfully completed 2 nights ahead of schedule.

The project scope

The scheme involved the resurfacing of 3km of the A595 over a 16km stretch between Duddon Bridge and Muncaster. This is the main arterial route through West Cumbria and serves the Sellafield nuclear site which employs 14,000 people.

Our scope included:

  • Surveys and setting out
  • Road closure applications
  • Traffic management
  • Planing out of the existing road surface
  • Excavation and minor civil works
  • Installation of 60 new gullies
  • Laying of binder and surface course
  • ­Road markings
  • Replacement of cat’s eyes

Key quantities:

  • 20mm binder: 1,534 Te
  • New Gullies: 60 t
  • Aggregate Industries Supercurve Surface Course: 2,101 t

Challenges & successes

To minimise disruption to road users, residents, and commuters to / from the Sellafield site and to maintain safety for our workforce, the gully replacement and surfacing work was carried out between 7pm and 5am each night. We successfully reopened the road at 5am each morning to allow Sellafield commuter traffic to flow freely.

Due to the location of the works, it was not possible to apply detours, so we operated a traffic management convoy system to escort residents to and from their properties throughout the night.

The adverse winter weather also meant that we had to be flexible in our approach to the project and we redeployed our team several times to other projects when the weather was too severe to progress the project.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services