The project scope

Reinstatement of the B6263 after landslip and flood damage caused by Storm Desmond in 2015. The road had been deemed unsafe for use by two-way traffic since a landslip, which was caused by flooding during Storm Desmond. Following the landslip, one side of the road was at risk of falling into the adjacent River Eden.

The project involved the construction of 750m of new road which was re-routed away from an adjacent watercourse to make the road more resilient to future severe weather events, with the road then tying into the existing B6263 at each end.

Scope of work included:

  • Surveying and setting out.
  • Construction of the new road base.
  • Laying of the binder and wearing courses.

Key quantities:

  • New road construction: 750 m
  • Base: 4,500 m²
  • Road planing: 15,500 m²

Challenges & successes

The road had been closed for a long period of time, resulting in detours and long travel distances for local residents. It was therefore imperative that when the project commenced, it had to be completed as quickly as possible. We worked with our client to align our schedule with his milestones and align our productivity outputs and resources to meet the required milestone dates.

We worked alongside numerous other contractors to complete the work as quickly as possible by holding daily planning meetings to ensure our work integrated seamlessly with the overall project schedule and that we did not delay any other trades.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services