Carlisle Citadel car park construction

Get in touch

Image
Civil Engineering / Surfacing & Cold Milling

  • ClientA E Yates

  • Value£130,000

  • DurationJuly 2019 - October 2019

Our efficient pre-planning ensured that the new car park was delivered on time with no impact on the adjacent Grade 1 listed building

The project scope

Delivery of all groundwork and surfacing to construct a new car park in Carlisle city centre on a site prone to flooding. This required the use of an Aggregated Industries permeable asphalt in two areas of the site to create a SUDS system to allow the surface water to drain through the asphalt surface.

Scope of the works included:

  • All groundworks
  • Drainage
  • Services ducting
  • Kerbing
  • Surfacing

Key quantities:

  • Permeable asphalt: 1,000 m²
  • Surface course: 2,100 m²
  • Kerbing: 300 m

Challenges & successes

Construction of the SUDS system required the use of clean, unbound aggregate. To ensure the plant and equipment did not ‘bog down’ in this unbound material, we used specialist tracked plant to travel over the area.

The construction site was located adjacent to a Grade 1 listed building which meant we had to plan the work to avoid going near it and take vibration into account during the works. We worked closely with our client and the local council to ensure we adhered to Grade 1 listed building regulations at all times.

The car park is located in a busy area of Carlisle city centre with restricted access for plant and material deliveries. To ensure we did not disrupt city centre businesses and residents, we produced a traffic management plan and avoided peak times for material and plant deliveries.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services