CCC Core Surfacing Framework contract

Get in touch

Image
Surfacing & Cold Milling

  • ClientCumberland Council

  • Value£20,000,000

  • DurationApril 2018 - April 2024

Our collaborative and flexible approach allowed our client to maximise asset condition in a changing priority environment.

The project scope

Delivery of highways surfacing repair and maintenance schemes throughout West Cumbria on a 4 year framework contract with task order values between £50,000 and £1,000,000. This work is being delivered by our team of 35 DSD staff and operatives deployed from our Carlisle Headquarters. The scope includes:

  • Inlay, overlay, partial or full reconstruction of the highway surface.
  • Carriageway patching.
  • Civils construction work.
  • Traffic management.
  • White lining.
  • Public liaison.
  • Production of Construction Phase Health & Safety Plans.
  • Development of robust Risk Assessments and Method Statements.

Key quantities:

  • Surfacing: 65,000 t
  • Drainage: 2,000 m
  • Tar bound recycling: 2,800 t

Challenges & successes

Many of the schemes were located in congested housing estates with high volumes of pedestrian and vehicle traffic with a need to maintain access for emergency vehicles. This, combined with project hazards and public interest in the work, caused logistical challenges. To overcome this, we trained our site supervisors in dealing with the public and held regular meetings with local residents and the emergency services to understand and mitigate their concerns.

Our client is funded on an annual basis by central government which required us to flex our work schedule to meet changing framework funding – especially towards the end of the financial year. This required us to work flexibly and to deploy our labour and plant on and off the work as required. We worked closely with the CCC team and our other clients to manage resources between our public and private sector projects to the satisfaction of all parties.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services