Flood remediation works, Egremont, Cumbria

Get in touch

Image
Civil Engineering

  • ClientVolker Stevin

  • Value£175,000

  • DurationJune 2020 - September 2020

We worked seamlessly with our client and local residents to provide a temporary pumping system to remove standing water.

The project scope

The scheme provided an upgrade of the existing surface water drainage systems in the Orgill area of Egremont to alleviate long term flooding of the local housing, sports fields and surrounding infrastructure. The project involved the replacement and diversion of water ways, drains and culverts to cope with excess rainfall and water run-off.

Our scope of work included:

  • Surveys and setting out.
  • Various temporary works schemes
  • Excavation and earthworks
  • Installation of in-situ cast concrete end wall structures
  • Installation of rock armour stone for the soak away
  • Installation of deep drainage pipework including tie ins to existing systems
  • Regrading, landscaping and finishing work to the surrounding areas

Key quantities:

  • Reinforced concrete: 50 m3
  • Rock armour: t
  • Drainage: 50 m

Challenges & successes

Due to the nature of the work and time of the year, we experienced high volumes of rainfall and had to deal with significant volumes of standing water from the sports fields and other infrastructure. Our Engineer and General Foreman worked closely with our client team and supplier, Selwood Pumps, to establish a temporary water ‘over pumping’ system. The pumping system included automatic ‘over pumping’ equipment with 8 inch bagging pipes to cope with the sheer volume of water that collected in our new structures each day.

We worked closely with the local residents to provide an automatic pumping system which did not need to run continuously and also to locate the pumps in a suitable location to minimise noise disturbance.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services