Surfacing & Cold Milling

  • ClientNorth East District Councils

  • Value£16,000,000

  • DurationDecember 2019 - December 2023

Our proactive and collaborative approach has resulted in numerous commendations from the public and local residents.

The project scope

Delivery of main carriageway resurfacing, road repairs and patching throughout North East England on a 4 year framework contract with task order values between £50,000 and £5,000,000. This work is being delivered to our client, the North East Procurement Organisation (NEPO), on behalf of 12 local authorities through our dedicated North East team of 15 DSD staff and operatives deployed from our Harrogate depot. The scope of the framework contract includes:

  • Full and partial reconstruction of highways
  • Inlay and overlay of highways
  • Carriageway patching
  • Interfacing with the 12 local authority client teams
  • Interfacing with other trades and Lot partners
  • Public liaison
  • Production of Construction Phase Health & Safety Plans
  • Development of robust Risk Assessments and Method Statements

Challenges & successes

Each of the twelve client local authorities has different requirements, specifications, processes and procedures to which we must comply. To ensure we fully meet the requirements of each local authority, we always work in a proactive, flexible and adaptable manner from project to project whilst sharing learning and best practice across our NEPO client base.

Many of the schemes are delivered in densely populated urban areas with high volumes of vehicle and pedestrian traffic and parked cars. To ensure work is delivered to schedule with minimal impact to local residents, we have enhanced our public liaison by appointing a dedicated Public Liaison Officer to coordinate meetings, communications and letter drops and to work with local residents.

The NEPO framework geographical area is extensive and often within highly populated town and city areas with schemes distributed over the 12 districts. To ensure short delivery distances, we have developed a substantial local supply chain within these districts to ensure we can deliver our projects efficiently.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.