New footpath, road resurfacing and associated works, Haverigg

Get in touch

Image
Civil Engineering / Surfacing & Cold Milling

  • ClientCumberland Council

  • Value£100,000

  • DurationNov 2021 -Dec 2021

The use of a vacuum excavator allowed us the complete the project quickly, with minimal disruption to residents and road users.

The project scope

The scheme involved the construction of 150m of new footpath and associated road resurfacing to provide access to local properties. This also included the installation of a new septic tank drainage outfall connection to the local river. Our scope included:

  • Surveys and setting out
  • Excavation and footpath construction
  • Kerbing including drop and tactile kerbing
  • Drainage connection including 4 new chambers, road crossing and outfall
  • Planing out of existing road surface
  • Laying of 50mm thick surfacing
  • Road markings

Key quantities:

  • New footpath construction: 150 m
  • Drainage: 60 m
  • Surfacing: 1,000 m²

Challenges & successes

During the project, we were required to install the drainage outfall beneath the road which contained uncharted services including a high-pressure gas main. To ensure we safely excavated the road for the drainage crossing without damaging services, we employed a Vacuum Excavator under a full road closure to expose the services. This then allowed us to safely and quickly install the drainage with minimal disruption to road users and residents.

The existing surface water drainage system was overloaded which had been causing problems for the residents for a long time. We provided a solution to this by designing the drainage under the road to accommodate the septic tank outfall and surface water drains – providing extra capacity to alleviate this long-standing problem.

The project was required at short notice just before the Xmas holidays. We mobilised within 1 week of contract award and successfully delivered the project before the Xmas deadline despite working in adverse weather.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services