North Yorkshire surfacing framework contract

Get in touch

Image
Surfacing & Cold Milling

  • ClientRingway Infrastructure Services

  • Value£18,000,000

  • DurationJanuary 2017 - December 2020

Early contractor involvement and pre planning ensured work was completed with minimal impact to road users and residents.

The project scope

Delivery of reconstruction, resurfacing, pre-surfacing dressing, patching and associated civil construction works throughout North Yorkshire on a 4 year framework contract with task order values between £50,000 and £1,000,000. This work was delivered by our team of 19 DSD staff and operatives deployed from our Harrogate depot. The schemes included:

  • Full depth road reconstruction
  • Carriageway reconstruction
  • Carriageway cold milling, resurfacing, pre-surface dressing and patching
  • Kerbing and drainage
  • Tar bound recycling

Key quantities:

  • Surfacing: 68,000 t
  • Cold milling: 58,000 t
  • Concrete haunching: 600 m3

Challenges & successes

Many of the schemes were located in rural areas where access for plant and equipment was very challenging and access for local resident was required at all times e.g. country lanes, hamlets and villages. Additionally, many of the schemes required lane closures and traffic management which had the potential to inconvenience to road users.

Through early contractor involvement, we reviewed each site with our client ahead of the works to plan the approach, traffic routes and the type of plant to be used to minimise impact on road users and the local community – especially at night.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image