Nuclear waste retrieval facility decommissioning project, Sellafield

Get in touch

Image
Civil Engineering

  • ClientDoosan Babcock

  • Value£75,000

  • DurationJanuary 2018

Our experienced logistics and stakeholder team ensured all labour, plant and materials were available when required.

The project scope

Completion of civil, mechanical and electrical construction works to enable decommissioning of the Pile Fuel Storage Silo at the Sellafield nuclear site, Cumbria. This work was carried out under a framework contract for our client, Doosan Babcock in the high security area of the Sellafield site. Our multi discipline team of project engineers and trades people completed this work in the highly congested, high hazard and regulated Pile Fuel Storage Silo area of the Sellafield site, which included:

  • Installation of new PVC doors in the main nuclear waste storage facility
  • Waterproofing repair to the existing 60 year old nuclear waste storage facility
  • Installation of new fire doors
  • Supply an installation of a new steel walkway and access steps to the existing structure
  • Full refurbishment of the operational plant control room including painting, flooring and secondary fix finishing
  • Assistance with the installation of a new camera system to the nuclear waste silo – including decommissioning of existing systems
  • Installation of a new drainage system around nuclear waste storage silo building perimeter

Challenges & successes

The work was carried out in one of the high security and radiologically controlled areas of the Sellafield site – with additional contraints due to access, logistics and effective working time. To ensure all labour, plant and materials were delivered to the workface at the correct time, our stakeholder and logistics team planned all work ahead of schedule and coordinated with client operations departments and other contractors to ensure the work was started on time and delivered to schedule.

Additionally, our flexible workforce pool of over 50 staff at Sellafield allowed us to assign labour as required to this work and reassign to other projects where delays were encountered.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services