Replacement Analytical Project welfare facility, Sellafield, Cumbria

Get in touch

Image
Civil Engineering

  • ClientMorgan Sindall

  • Value£1,700,000

  • DurationMarch 2022 - December 2022

The project was delivered in a high security area of the site with numerous uncharted services and redundant underground features.

The project scope

The scheme involved the site preparation, removal of redundant services, construction of foundations and installation of new services for the project office and workforce welfare facility for the £1bn Replacement Analytical Project at Sellafield. The project involved extensive ground investigations to locate and remove existing services prior to construction of new drainage systems, services and building foundations. Our scope of work included:

  • Ground investigation (8 off trial holes 1m deep) to locate underground features after topographical surveys.

  • Tracing and removal of existing cabling, ducting, draw pits, street lighting, street furniture and CCTV systems.

  • Removal of existing underground services including foul water and surface drainage systems.

  • Relocation of services including street lighting, CCTV systems and BT marshalling cabinets.

  • Installation of new foul and surface water drainage systems and water, electricity, telecoms, and fibre optic services ducting and tie ins to existing systems.

  • Construction of 50m3 concrete strip foundations, access ramps and entrance steps.

  • Reprofiling of footpaths to maintain safe pedestrian access.

  • Construction of 2 off new electrical distribution unit foundation plinths in the high security area.

  • Construction of car park including subbase, asphalt surfacing, white lining, street furniture and signage.

  • Removal of waste and spoil and hard landscaping.

  • Pressure testing and connection of new 90mm water mains.

  • Asphalt surfacing of footpaths, road crossings and tie ins into new car park.

  • Assistance with installation of the 66 modules, 3 tier office accommodation (slinging and escort duties).

Key quantities:

  • Redundant Services removed: 200 m
  • Waste removed: 1,950 t
  • New voltage service ducting: 600 m

Challenges & successes

The project is located on a previously used industrial site with a significant number of uncharted buried services and redundant underground concrete features which had to be safely located before main excavation work could be started. We worked closely with the adjacent building owners, Ground Investigation, and Topography teams to identify the exact location of the buried services and features by hand digging several trial holes. The work was carried out in and adjacent to a high security area which required us to work to strict security protocols and collaborate with the building owners and security department during the planning and delivery phases of the works. The project is also located in a frequently used pedestrian thoroughfare which required us to plan our work and install temporary and permanent works to always maintain safe pedestrian and emergency vehicle access to the adjacent operational facilities.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services