Surfacing & Cold Milling

  • ClientBam Nutall

  • Value£1,650,000

  • DurationFebruary 2021 - September 2021

Our flexible approach during adverse weather conditions resulted in completion of the project on time and to budget.

The project scope

Stourton Park and Ride at Leeds is the third Park and Ride scheme to be constructed by Leeds City Council to help reduce congestion and pollution in Leeds City centre. The facility is fully solar powered, has capacity for 1,200 vehicles including 26 electric car charging bays and is served by a fleet of zero-emission electric buses.

As a sub-contractor to BAM Nuttall, our scope involved the widening of the existing trunk road to facilitate the new park and ride facility and surfacing of the access roads and internal parking areas, including:

 

  • Site boundary and traffic management
  • Site clearance
  • Earthworks
  • Carriageway construction
  • Surfacing
  • New kerbs, footways, and paved areas

Key quantities:

  • Road surface removed: 16,000 t
  • Distance: 37,000 m²

Challenges & successes

All work was carried out at night under restricted hours working to reduce city centre traffic congestion and the project was constructed during winter and spring with adverse weather conditions which meant we had to be flexible with our surfacing schedule.

Some areas of resurfacing were carried out under a low bridge with restricted head height, meaning that we had to use walking floor wagons to supply materials to the road construction.

The project was completed on time and budget.


Image
Latest Case Studies
A66 Great Broughton to Fitz Roundabout Resurfacing
Surfacing & Cold Milling
Resurfacing 4.6km of the A66 between Great Broughton and Fitz Roundabout, Cockermouth – covering eastbound and westbound carriageways along the main trunk road providing access to West Cumbria.
Find Out More
B5292 Lorton Street Resurfacing, Recycling & Civils
Civil Engineering / Surfacing & Cold Milling
With DSD Construction acting as Principal Contractor to Cumberland Council, this scheme involved planing and resurfacing of the B5292 carriageway at Lorton Street, Cockermouth using recycled materials to avoid hazardous waste disposal of tar bound material.
Find Out More
B2 Reinforced Concrete Prop Installation, Sellafield
Civil Engineering
With DSD Construction acting as subcontractor to Altrad Babcock, this scheme involved the installation of reinforced concrete props in a nuclear facility to allow installation of a large roller shutter door to facilitate future decommissioning works.
Find Out More

Image
DSD Construction Services